APAC 42-story mixed-use core
Background: 42-story mixed-use core with three overlapping jibs. Process: flat-top climb to 68 m freestanding with monsoon gust monitoring. Result: tip-load chart held with zero rework across the 2023 pour season.
Enter your freestanding height and tip-load target, then review Potain references with matching city-block constraints, commissioning timelines and contractor feedback.
This interactive layout mirrors how our applications engineers shortlist dossiers. Punch in annual operating hours, current crane class, diesel-generator support cost and local grid factor if you run hybrid power — then compare payback against a modern Potain package sized for your plot. Numbers are planning aids; final quotes still require a site walk.
Background: 42-story mixed-use core with three overlapping jibs. Process: flat-top climb to 68 m freestanding with monsoon gust monitoring. Result: tip-load chart held with zero rework across the 2023 pour season.
Background: tight historic-modern canyon with neighbor swing limits. Process: luffing package plus encoder anti-collision zoning. Result: zero neighbor swing incidents; AS 2550 witness pack accepted in five days (2024).
Background: 18-month housing corridor with street-reopen rules. Process: self-erect pads with same-day fold cycles. Result: overnight parts-hub coverage kept mean-time-to-repair inside contracted windows through 2022–2024.
Background: bridge approach piers with edge pour tip loads. Process: boom length staged for precast cycles and wire-rope discard logging. Result: clean discard log through season one with no tip-load chart revisions mid-pour.
Case numbers are planning references for similar freestanding height, tip load and wind class — they are not transferable warranties. Soft fills, incomplete mats or utility outages can still delay erection even when the crane class matches the dossier. Final quotes require a site walk and geotech sign-off.
We match planning numbers with a financing and delivery proposal sized to your freestanding height, tip-load envelope and replacement window — then attach comparable Potain case dossiers your EPC can file.